{"id":321,"date":"2016-10-19T13:15:38","date_gmt":"2016-10-19T17:15:38","guid":{"rendered":"https:\/\/portfolios.cs.earlham.edu\/?p=321"},"modified":"2016-10-19T15:52:44","modified_gmt":"2016-10-19T19:52:44","slug":"project-design-proposal","status":"publish","type":"post","link":"https:\/\/portfolios.cs.earlham.edu\/index.php\/2016\/10\/19\/project-design-proposal\/","title":{"rendered":"Project Design and Proposal"},"content":{"rendered":"<p>The current version of the proposal, which includes my revised thoughts from the survey paper as well as the design and timeline of the project:<\/p>\n<p><a href=\"https:\/\/portfolios.cs.earlham.edu\/wp-content\/uploads\/2016\/10\/Proposal.pdf\">Proposal.pdf<\/a><\/p>\n<p><a href=\"https:\/\/portfolios.cs.earlham.edu\/wp-content\/uploads\/2016\/10\/Presentation-3.pdf\">Presentation-3.pdf<\/a><\/p>\n<p>Deadlines:<\/p>\n<ul>\n<li>October 26: Develop a preliminary test build for the application by learning a simple gesture and controlling the playback of a sawtooth wave.<\/li>\n<li>November 2: Add more complex gestures, particularly conductor gestures, and add more control over the sawtooth wave accordingly.<\/li>\n<li>November 9: Integrate JACK for routing gesture messages to LMMS for integration with VST instruments and synthesizers.<\/li>\n<li>November 16: Complete the first draft of the paper.<\/li>\n<li>November 23: Continue working on application. Complete outline for the poster.<\/li>\n<li>November 30 or December 4: Presentation<\/li>\n<li>December 12: Complete the second draft of the paper.<\/li>\n<li>December 16: Complete the final draft of the paper.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The current version of the proposal, which includes my revised thoughts from the survey paper as well as the design and timeline of the project: Proposal.pdf Presentation-3.pdf Deadlines: October 26: Develop a preliminary test build for the application by learning a simple gesture and controlling the playback of a sawtooth wave. November 2: Add more &#8230; <a title=\"Project Design and Proposal\" class=\"read-more\" href=\"https:\/\/portfolios.cs.earlham.edu\/index.php\/2016\/10\/19\/project-design-proposal\/\" aria-label=\"Read more about Project Design and Proposal\">Read more<\/a><\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-321","post","type-post","status-publish","format-standard","hentry","category-edward"],"_links":{"self":[{"href":"https:\/\/portfolios.cs.earlham.edu\/index.php\/wp-json\/wp\/v2\/posts\/321","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/portfolios.cs.earlham.edu\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/portfolios.cs.earlham.edu\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/portfolios.cs.earlham.edu\/index.php\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/portfolios.cs.earlham.edu\/index.php\/wp-json\/wp\/v2\/comments?post=321"}],"version-history":[{"count":3,"href":"https:\/\/portfolios.cs.earlham.edu\/index.php\/wp-json\/wp\/v2\/posts\/321\/revisions"}],"predecessor-version":[{"id":340,"href":"https:\/\/portfolios.cs.earlham.edu\/index.php\/wp-json\/wp\/v2\/posts\/321\/revisions\/340"}],"wp:attachment":[{"href":"https:\/\/portfolios.cs.earlham.edu\/index.php\/wp-json\/wp\/v2\/media?parent=321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/portfolios.cs.earlham.edu\/index.php\/wp-json\/wp\/v2\/categories?post=321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/portfolios.cs.earlham.edu\/index.php\/wp-json\/wp\/v2\/tags?post=321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}