Skip to main content
Earlham CS/DS Portfolios

CS488 – Week 14 – Update

During the past week, I have submitted the second version of my paper. After submission, I have continued working on the final parts of the paper. These parts include finishing the social engineering results and making the recommended changes to certain images to enhance my paper. With the given feedback, I have also started making … Read more

CS 488 – Update – April 6th

This past week I mainly worked on the first draft of my poster. It was much easier to complete since I have the majority of my project finished. In the coming week, I plan to continue my testing with my virtual servers, Kali and Metasploitable. Luckily, I have not encountered any obstacles when trying to … Read more

CS 488 – Week 7 – Elevator Pitch

My project aims to develop a reproducible penetration test that can help secure a large network. Tests will come from three different avenues- physical and technical testing, as well as social engineering. The results from these tests will be put together in a final report and given to the appropriate people who can make appropriate … Read more

CS 488 – Week 5 – Update

This week I spoke with Charlie and gained clarity into how Earlham handles guest connections through ECOpen and from there does not allow access to the network within Earlham but simply gives access to the outside internet. I also started my Social Engineering test on Thursday. I ran into some speed bumps with that and … Read more

CS 488 – Week 4 – Update

This week, I continued my testing for the physical aspect of my project. During this testing, I tried to focus on ECOpen since it says there is no encryption associated with the network. Come to find out, there is still an authentication process that one must go through when trying to connect to ECOpen. So … Read more

CS 488 – Week 3 – Update

This past week I have really dug into my physical testing. Using Kali Linux and a wireless adapter (supports monitor mode), I was able to use commands to see which networks were available and from there, I could see all of the clients connected to each network. However, I only could see the BSSID (MAC … Read more

CS 488 – Week 2 – Update

This past week, I have started phase 1 of my project, testing the physical security of the network. Along with starting this phase, I started to write the Google survey that will be used w/ the social engineering experiment. I also ordered the hardware needed for the social engineering test. I have not encountered any … Read more

CS 488 – Week 1 – Update

This week was mainly for refreshing myself on the details of my project. I finalized Charlie to be my advisor for 488 and set up a weekly meeting time with him. I also completed the 3 slide powerpoint in preparation for the presentation in the joint class of 388/488. I adjusted my timeline and plan … Read more

CS388 – Week 12 -Update

During this week I met with Charlie to review feedback for the first draft of the proposal. I reconstructed this version for the 2nd draft. I also read some papers for the next pass. These were more directly related to the software I am going to use.

CS388 – Week 12 – Update

During the past week, I finished the first draft of my proposal and started to make those changes for the second draft. I have also continued reading some papers for their next pass. I continued to watch videos and read content related to the USB Rubber Ducky. I have started to put together some scripts … Read more

CS388 – Week 11 – Update

Much of my work this week has consisted on working through the first draft of the proposal as well as reading some papers for the next pass. I also found a couple other sources to use. These new sources were not research papers but rather articles related to my project.

CS388 – Week 10 – Update

During this past week, I have revised how I want to implement my social engineering attack. I want to use what is called a USB rubber ducky where you insert a MicroSD card into the USB. This card has payloads on it which you insert into the victims computer and then the payload is executed. … Read more

CS388 – Week 9 – Updates

For this week, I wrote my proposal outline. During the next two weeks I will use this to construct the 1st draft of my proposal. I also spoke with Charlie about taking a different approach to the social engineering aspect of my project. Most of these I have found YouTube videos to demonstrate and describe … Read more

CS388 – Week 6 – Update

This week, I finalized who my advisor will be (Charlie). I also decided that I will be working on my security testing idea as my main project. To start this, I spoke with Brendan Post (IT) to discuss my ideas. He was happy to help me and I will be in further discussion with him … Read more

CS388 – Week 5 – Update

I spoke with Charlie this past week and we both decided that my first idea is my best one. So, I decided this was the one I was going to pursue my penetration testing idea and found 6 more articles for this. A couple of the articles I found were about professors having/teaching a first-time … Read more

CS388- Week4- Update

For this week, I created my annotated bibliographies for 2 papers of each of my 3 ideas. I also spoke with Charlie and refined 2 of 3 ideas. For my penetration testing idea, instead of making the project solely on the technical side, I want to basically have three phases of this project- technical, social, … Read more

CS388- Week3- Update

For this week, I updated my 3 proposal ideas and met with Charlie to review and seek his advice. Prior to this meeting, I found my 5 articles for each and used these discuss potential problems if each idea was used. Post meeting w/ Charlie, I read a little deeper into the articles and now … Read more

CS388 – Week 2 – Three Ideas

1st Idea My 1st idea pretty much stayed the same as it was last week w/ some additional details. Instead of just testing/researching about network security, Charlie advised to look into physical security (open ports on servers, etc) and social security. 2nd Idea Hacking into an air gapped device. Air gapped means that none of … Read more

CS388 – Week 1 – First Idea

Name of Your Project Penetration testing to show the weaknesses of businesses What research topic/question your project is going to address? What results can be gained from businesses investing in someone do penetration   What technology will be used in your project Personal computer & Network Adapter What software and hardware will be needed for … Read more